| PHENIX
CONSTRUCTION PROJECTS | |
 |
 |
|
 |
 |
 |
|
Name: |
TRA
OU2-13 WAG2 R.A. |
|
|
Location: |
INEL-TRA |
|
|
Owner: |
Parons Infrastructure & Technology
Group Inc. |
|
|
|
|
P.O. Box 1625/ Mail stop 3954 Idaho Falls,
Idaho 83415-2426 |
|
|
SA: |
Bob Oliver (208) 526-2768 |
|
|
P.M.: |
Craig Reese (208) 552-7310 |
|
|
Desc: |
Removed existing fences, pipe
and manhole abandonment, 265,694 S.F. clearing & grubbing,
56,071 C.Y. compacted backfill into four existing ponds,
grading of pond areas, construct gravel barrier consisting
of 2,128 C.Y. 4” layer of pea gravel, 6,300 C.Y.
12” layer of 2” – 8” cobble and
3,192 C.Y. 6” layer of pea gravel, haul and place
15,900 C.Y. of rip rap material, install signs and markers,
and 10 acres of revegitation. |
|
|
|
|
|
| Click
for Additional Images |
|
|
|
|
| |
|
|
|
|
|
|
|
Length: |
January 13, 1999 to October 13, 1999 |
|
|
|
|
Contract: |
Original: $895,879.00 CID’s
$56,174.70 Total $952,053.70 Lump sum unit price contract |
|
|
|
|
|
|
|
|
Compl: |
Work Completed September 27, 1999 |
|
|
 |
| |
|
 |
|
Name: |
INTEC
Service Wastewater Discharge Facility |
|
|
Location: |
INEL-INTEC |
|
| |
Owner: |
Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont
Ave. P.O. 1625 Idaho Falls, ID 83415 |
|
|
SA: |
Donna Whitman (208) 526-0721 |
|
|
S.T.R: |
Lex Strain (208) 526-6858 |
|
| |
Desc.: |
Clear & Grub 708,256 S.F.
haul and place 4,250 C.Y. pit run gravel to construct
4,719’ access road, cut and fill 26,560 C.Y. to
construct two 248’x 248’ percolation ponds,
48,903 C.Y. pipe trench excavation, import and place 6,069
pipe sand bedding, Install 22,000 L.F. 16” HDPE
Pipe and appurtenances, 48,903 C.Y. pipe trench backfill,
154’ of 20” horizontal drilling, install concrete
discharge aprons, install 43 warning signs, asphalt removal,
asphalt repair, 25 acres revegetation of construction
areas, removed four existing pumps, and installed four
G.F.E. Pumps at different phases. |
|
| Click
for Larger Image |
|
|
| |
|
|
|
|
|
|
|
|
|
|
Length: |
August 7, 2000 to June 17, 2002 |
|
|
|
Contract: |
Original $1,850,422.00 CID’s $299,851.00
Total $2,150,273.00 |
|
|
|
Compl: |
Met Schedule |
|
|
| |
|
 |
|
Name: |
INEL
Cercla Disposal Facility |
|
|
Location: |
INEL – INTEC |
|
| |
Owner: |
Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont
Ave. P.O. Box 1625 Idaho Falls, ID 83415-1625 Subcontractor
to CH2MHILL Constructors, Inc. P.O. Box 22508 Denver,
CO 80222-0508 CH2MHILL Contact: Craig Reese 151 N. Ridge
Suite 150 Idaho Falls, ID 83402. (208)552-7310 |
|
|
SA: |
Mike Drake |
|
| Click
for Additional Images |
|
|
|
|
|
|
|
Desc: |
Construction of 500,000 C.Y.
Cercla Disposal Landfill and two 1 ½ acre evaporation
ponds. 137,627 S.Y. clearing and grubbing, 339,751 C.Y.
earth excavation, 14,052 C.Y. drainage gravel screening,
120,423 S.Y. sub-grade preparation for embankments, 232,194
C.Y. embankment, constructed 4900 L.F. drainage ditch,
installed 150 L.F. CMP, constructed Vados zone monitoring
system, hauled 34,582 C.Y. clay soil from off site borrow
source, mixed and blended 3000 Ton bentonite into soil,
placed and compacted 34,582 C.Y. of soil bentonite admix,
placed 9,164 C.Y. drained gravel, placed 49,692 C.Y. operation
layer gravel, excavated and backfilled 6,490 L.F. Liner
anchor trench, excavated and backfilled 3,887 L.F. of
water line and service waste line trench, excavated and
backfilled 1,301 L.F. of electric trench, reclamation
of construction site and borrow source approx. 45 acres.
Over 50 shelby tube samples (laboratory permeability)
were taken to verify completed areas of the liner had
hydraulic conductivity of less than 5x10-8 cm/sec hydraulic
conductivity. All samples passed. |
|
| |
|
|
|
|
Length: |
July 9, 2001 to March 30, 2003 |
|
|
|
Contact: |
$4,536,187.00 |
|
|
|
Compl: |
March 30, 2003 |
|
|
| |
|
 |
|
Name: |
FY-98-INEL
Road Rehab Task IV |
|
|
Location: |
INEL 12 Locations |
|
|
Owner: |
Bechtel BWXT Idaho LLC (BBWI)
2525 Fremont Ave. P.O. Box 1625 Idaho Falls, ID 83403-5310 |
|
|
|
|
|
SA: |
Robert Oliver |
|
|
Desc.: |
Construction surveying and
staking, 1461 C.Y. excavation, hauled and placed 517 C.Y.
pit run gravel furnish – hauled and placed 2,384
C.Y. ¾” base gravel, furnish – hauled
placed 4,357 ton asphalt, removed and replaced 159 parking
bumpers, 12,550 L.F. paint striping, 20,035 L.F. repaired
cracked asphalt, 48,369 S.Y. seal coating, furnished and
installed various drainage ditcher removed and replaced
110 L.F. concrete valley gutter, installed guard posts
and minor revegetation work, work was performed at 12
different locations across the INEL. |
|
|
|
|
| Click
for Larger Image |
|
|
|
| |
|
|
|
|
|
Length: |
June 27, 2001 to October 6, 2001 |
|
|
|
Contract: |
$691,389.65 CID’s $27,914.12 Total
$719,303.77 |
|
|
|
Compl: |
Ahead of schedule |
|
|
| |
|
 |
|
Name: |
ICDF
Implementation Project and Cell 2 Construction |
|
|
Location: |
INEL – INTEC, CFA, and TAN |
|
| |
Owner: |
Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont
Ave. P O Box 1625 Idaho Falls, ID 83415-1625. Subcontractor
to S.M. Stoller Corporation 1780 First Street Idaho Falls,
ID 83401 |
|
|
SA: |
Mike Drake 526-2593 |
|
|
Desc.: |
Excavation of 515,950 tons
of low level radiological and chemical contaminated soils
at CFA, ARA, TAN, and INTEC, 152,075 C.Y. of imported
backfill for excavated areas and 59 acres of reclamation
and revegetation of disturbed areas.
Construction of ICDF Cell 2 153,445 S.Y. of clearing and
grubbing, 206,836 C.Y. of excavation, 24,687 C.Y. of earth
embankment, hauling placement and compaction of 37,513
C.Y. of soul bentonite admix, screen and place 5,882 C.Y.
drain gravel, placement of 32,886 C.Y. of operation gravel,
excavation and backfill 3,150 L.F. of anchor trench and
reclamation of construction site and borrow source. Approx
21 acres. |
|
| Click
for Additional Images |
|
|
| |
|
|
|
|
Length: |
August 1, 2003 – November 1, 2007 |
|
|
|
Contract: |
$6,636,008.70 |
|
|
|
Compl: |
Project currently in progress |
|
|
| |
|
 |
|
Name: |
INTEC
Sewage Treatment Plant Upgrade |
|
|
Location: |
INEL – INTEC |
|
|
Owner: |
Bechtel BWXT Idaho, LLC (BBWI)
2525 Fremont Ave. P O Box 1625 Idaho Falls, ID
83415- 1625 |
|
| |
|
|
|
SA: |
Mike Barnes 526-2768 |
|
|
Desc.: |
Remove existing asphalt, locate
and identify 27 existing utilities using vacuum excavator
method, 10,748 C.Y. pipe trench excavation, import and
place 614 C.Y. pipe sand bedding, Install 3,000 L.F. 4”
HDPE Pipe, Install 4 manholes, Install lift station, 10,748
C.Y. pipe trench backfill, 8325 S.F. asphalt repair, demolition
of 5 existing manholes and appurtenances, 15,500 C.Y.
of backfill for existing infiltration trenches, install
underground and overhead power to lift station, remove
and relocate existing fence and 4 acres of revegetation
work. |
|
| Click
for Larger Image |
|
|
| |
|
|
|
|
Length: |
June 14, 2004 to December 10, 2004 |
|
|
|
Contract: |
Original $ 1,106,415.00 CN’s $ 6,875.00
Total $ 1,113,290.00 |
|
|
|
Compl: |
Met Schedule |
|
|
| |
|
 |
|
Name: |
Unmanned
Aerial Vehicle Paving |
|
|
Location: |
INEL Experimental Test Station |
|
|
Owner: |
Bechtel BWXT Idaho, LLC (BBWI)
2525 Fremont Ave. P O Box 1625 Idaho Falls, ID
83415- 1625 |
|
| |
|
|
|
SA: |
Glenn Clemons 526-5728 |
|
|
Desc.: |
Furnish and Install 1235 Ton
2” thick of class 3 asphalt on 100 feet by 1000
feet UAV runway |
|
| Click
for Larger Image |
|
|
|
Length: |
September 7, 2004 to September
17, 2004 |
|
|
|
|
|
|
Contract: |
Original $ 79,100.00 no CN’s Total
$ 79,100.00 |
|
|
|
Compl: |
Ahead of Schedule |
|
|
|
|
|
|
|
| |
|
|
|
|
To see our complete Project Portfolio,
please click the following link below: |
|
|
Phenix
of Idaho, Inc. Project Portfolio |
|
|
|
|
|
|
 |
 |
|
 |
|
|
 |