|   PHENIX CONSTRUCTION PROJECTS   |
Name: TRA OU2-13 WAG2 R.A.
Location: INEL-TRA
Owner: Parons Infrastructure & Technology Group Inc.
P.O. Box 1625/ Mail stop 3954 Idaho Falls, Idaho 83415-2426
SA: Bob Oliver (208) 526-2768
P.M.: Craig Reese (208) 552-7310
Desc: Removed existing fences, pipe and manhole abandonment, 265,694 S.F. clearing & grubbing, 56,071 C.Y. compacted backfill into four existing ponds, grading of pond areas, construct gravel barrier consisting of 2,128 C.Y. 4” layer of pea gravel, 6,300 C.Y. 12” layer of 2” – 8” cobble and 3,192 C.Y. 6” layer of pea gravel, haul and place 15,900 C.Y. of rip rap material, install signs and markers, and 10 acres of revegitation.
Click for Additional Images
 
Length: January 13, 1999 to October 13, 1999
Contract: Original: $895,879.00 CID’s $56,174.70 Total $952,053.70 Lump sum unit price contract
Compl: Work Completed September 27, 1999
   
Name: INTEC Service Wastewater Discharge Facility
Location: INEL-INTEC
  Owner: Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont Ave. P.O. 1625 Idaho Falls, ID 83415
SA: Donna Whitman (208) 526-0721
S.T.R: Lex Strain (208) 526-6858
  Desc.: Clear & Grub 708,256 S.F. haul and place 4,250 C.Y. pit run gravel to construct 4,719’ access road, cut and fill 26,560 C.Y. to construct two 248’x 248’ percolation ponds, 48,903 C.Y. pipe trench excavation, import and place 6,069 pipe sand bedding, Install 22,000 L.F. 16” HDPE Pipe and appurtenances, 48,903 C.Y. pipe trench backfill, 154’ of 20” horizontal drilling, install concrete discharge aprons, install 43 warning signs, asphalt removal, asphalt repair, 25 acres revegetation of construction areas, removed four existing pumps, and installed four G.F.E. Pumps at different phases.
Click for Larger Image
   
 
 
Length: August 7, 2000 to June 17, 2002
Contract: Original $1,850,422.00 CID’s $299,851.00 Total $2,150,273.00
Compl: Met Schedule
   
Name: INEL Cercla Disposal Facility
Location: INEL – INTEC
  Owner: Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont Ave. P.O. Box 1625 Idaho Falls, ID 83415-1625 Subcontractor to CH2MHILL Constructors, Inc. P.O. Box 22508 Denver, CO 80222-0508 CH2MHILL Contact: Craig Reese 151 N. Ridge Suite 150 Idaho Falls, ID 83402. (208)552-7310
SA: Mike Drake
Click for Additional Images
Desc: Construction of 500,000 C.Y. Cercla Disposal Landfill and two 1 ½ acre evaporation ponds. 137,627 S.Y. clearing and grubbing, 339,751 C.Y. earth excavation, 14,052 C.Y. drainage gravel screening, 120,423 S.Y. sub-grade preparation for embankments, 232,194 C.Y. embankment, constructed 4900 L.F. drainage ditch, installed 150 L.F. CMP, constructed Vados zone monitoring system, hauled 34,582 C.Y. clay soil from off site borrow source, mixed and blended 3000 Ton bentonite into soil, placed and compacted 34,582 C.Y. of soil bentonite admix, placed 9,164 C.Y. drained gravel, placed 49,692 C.Y. operation layer gravel, excavated and backfilled 6,490 L.F. Liner anchor trench, excavated and backfilled 3,887 L.F. of water line and service waste line trench, excavated and backfilled 1,301 L.F. of electric trench, reclamation of construction site and borrow source approx. 45 acres. Over 50 shelby tube samples (laboratory permeability) were taken to verify completed areas of the liner had hydraulic conductivity of less than 5x10-8 cm/sec hydraulic conductivity. All samples passed.
 
Length: July 9, 2001 to March 30, 2003
Contact: $4,536,187.00
Compl: March 30, 2003
   
Name: FY-98-INEL Road Rehab Task IV
Location: INEL 12 Locations
Owner: Bechtel BWXT Idaho LLC (BBWI) 2525 Fremont Ave. P.O. Box 1625 Idaho Falls, ID 83403-5310
SA: Robert Oliver
Desc.: Construction surveying and staking, 1461 C.Y. excavation, hauled and placed 517 C.Y. pit run gravel furnish – hauled and placed 2,384 C.Y. ¾” base gravel, furnish – hauled placed 4,357 ton asphalt, removed and replaced 159 parking bumpers, 12,550 L.F. paint striping, 20,035 L.F. repaired cracked asphalt, 48,369 S.Y. seal coating, furnished and installed various drainage ditcher removed and replaced 110 L.F. concrete valley gutter, installed guard posts and minor revegetation work, work was performed at 12 different locations across the INEL.
Click for Larger Image
 
Length: June 27, 2001 to October 6, 2001
Contract: $691,389.65 CID’s $27,914.12 Total $719,303.77
Compl: Ahead of schedule
   
Name: ICDF Implementation Project and Cell 2 Construction
Location: INEL – INTEC, CFA, and TAN
  Owner: Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont Ave. P O Box 1625 Idaho Falls, ID 83415-1625. Subcontractor to S.M. Stoller Corporation 1780 First Street Idaho Falls, ID 83401
SA: Mike Drake 526-2593
Desc.: Excavation of 515,950 tons of low level radiological and chemical contaminated soils at CFA, ARA, TAN, and INTEC, 152,075 C.Y. of imported backfill for excavated areas and 59 acres of reclamation and revegetation of disturbed areas.
Construction of ICDF Cell 2 153,445 S.Y. of clearing and grubbing, 206,836 C.Y. of excavation, 24,687 C.Y. of earth embankment, hauling placement and compaction of 37,513 C.Y. of soul bentonite admix, screen and place 5,882 C.Y. drain gravel, placement of 32,886 C.Y. of operation gravel, excavation and backfill 3,150 L.F. of anchor trench and reclamation of construction site and borrow source. Approx 21 acres.
Click for Additional Images
 
Length: August 1, 2003 – November 1, 2007
Contract: $6,636,008.70
Compl: Project currently in progress
   
Name: INTEC Sewage Treatment Plant Upgrade
Location: INEL – INTEC
Owner: Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont Ave. P O Box 1625 Idaho Falls, ID
83415- 1625
   
SA: Mike Barnes 526-2768
Desc.: Remove existing asphalt, locate and identify 27 existing utilities using vacuum excavator method, 10,748 C.Y. pipe trench excavation, import and place 614 C.Y. pipe sand bedding, Install 3,000 L.F. 4” HDPE Pipe, Install 4 manholes, Install lift station, 10,748 C.Y. pipe trench backfill, 8325 S.F. asphalt repair, demolition of 5 existing manholes and appurtenances, 15,500 C.Y. of backfill for existing infiltration trenches, install underground and overhead power to lift station, remove and relocate existing fence and 4 acres of revegetation work.
Click for Larger Image
 
Length: June 14, 2004 to December 10, 2004
Contract: Original $ 1,106,415.00 CN’s $ 6,875.00 Total $ 1,113,290.00
Compl: Met Schedule
   
Name: Unmanned Aerial Vehicle Paving
Location: INEL Experimental Test Station
Owner: Bechtel BWXT Idaho, LLC (BBWI) 2525 Fremont Ave. P O Box 1625 Idaho Falls, ID
83415- 1625
   
SA: Glenn Clemons 526-5728
Desc.: Furnish and Install 1235 Ton 2” thick of class 3 asphalt on 100 feet by 1000 feet UAV runway
Click for Larger Image
Length: September 7, 2004 to September 17, 2004
Contract: Original $ 79,100.00 no CN’s Total $ 79,100.00
Compl: Ahead of Schedule
       